SH Complex Reconstruction Project
Awarded in 2005, this project was executed for ONGC, with DOEIL working
as subcontractor to Larsen & Toubro Ltd. After receiving numerous
complaints from pilots about the difficulties in landing helicopters on
the SH Platform, due to various obstructions, It was decided that the
helideck needed to be raised. The Rs. 3716 lacs job entailed raising of
the existing helideck by 4 mtrs., Installation of a walkway bridge, installation
of structural steel deck extensions, piping erection offshore, provision
of piping supports, dismantling, erection and revamp and finally supply
of marine spread.
The entire operation was carried out by providing additional piping supports
while lifting the helideck in a controlled environment, using hydraulic
jacks.
This job is known to be the first of its kind in the entire offshore industry
and is a matter of pride for DOEIL.