Replacement of Leg Section of Sagar Jyoti
Awarded in 1991, this project was executed for ONGC, with DOEIL working
as subcontractor to Mazgaon Docks Ltd. The rig had suffered immense damage
to 2 of its legs during the punch through in 1989 and hence needed to
be replaced. The Rs. 1554 lacs job entailed towing the rig to Nhava port,
replacing two of the leg sections, repairs, painting of new leg sections
and subsequently towing the rig back to Mumbai High.This job was divided
into two phases. Phase 1 involved foundation work and replacement of the
upper shock pads. Phase 2 entailed replacement of the damaged leg sections
and lower shock pads after the rig had been jacked up.In phase 2, The
entire rig was raised to 100 meters and all services, at that height,
were provided by us. This included providing 400 ton per hour of salt
water required for rigboard services as well as fresh water for a duration
of almost two months. Extensive work was sometimes done as high as 125
meters with no accidents or mishaps. The removal and fitting of separate
leg sections weighing 152 and 90 tonnes each, involved meticulous planning
and required use of a DEMAG CC 4800 heavy lift crane from Singapore. This
challenging project was executed entirely by DOEIL, with help provided
by Keppel for the more specialized welding activities.