As a part of their redevelopment plan ONGC had initiated this project in the Mumbai High South Field. The contract was awarded to the consortium of Larsen & Toubro and DOEIL in April 2007.
The contract value was INR 114.08 Crores of which INR 62.17 Crores was towards the DOEIL's scope of responsibilities. The objective of this project was to enhance production of crude by modifying the existing facilities, which meant modification of sub-sea and top side structures and production related modifications on six of the existing well platforms.
DOEIL's scope of work covered the pre-engineering survey and inputs for design engineering, transportation, providing marine spread, offshore installation both above and underwater and post construction surveys. DOEIL enabled swift completion of this project due to its in-house integrated expertise in marine, diving and topside services.



6 CLAMP 1

6 CLAMP 2

6 CLAMP 3

6 CLAMP 4


Back

  Click to go to top of the page
   
 Copyright © 2009 | Dolphin Offshore Enterprises (India) Ltd. | All rights reserved Design by v4web