Pipe Replacement Project II
Awarded in 2008, this project is being executed for ONGC, with DOEIL working
as subcontractor to Leighton Contractors (INDIA) Pv. Ltd. The Rs. 28.80
crores job includes the provision of mixed gas diving services, going
up to a maximum depth of 70 meters. This will be done with the help of
a Diving Support Vessel, needed for carrying out a Pre-engineering Jacket
Dive Survey, Clamp Installation and Gate Closing of Risers, for 45 Risers
and 28 Flexible I/J tubes.